[1] Kim,Y.W,DOSSICK C.S.What Makes the Delivery ofa Project Integrated Acase study of Children's Hospital,Bellevue,WA [J] Lean Construction Journal,2011,1:53-56.
[2] Ghassemi R,Becerik-Gerber B.Transitioning to Integrated Project Delivery: Potential barriers and lessons learned[J].Lean construction journal,2011:32-52.
[3] Sacks R,Koskela L,Dave B A,et al Interaction of Lean and Building Information Modeling in Construction[J]. Journal of Construction Engineering and Management,2010, 136:968-980.
[7]Fish, Aman.Integrated project delivery the obstacles of implementation[OL].[2011.08.08].
[8]Vishal, Singh, and, et al. A theoretical framework of a BIM-based multi-disciplinary collaboration platform[J]. Automation in Construction,2011.
[9]Isikdag U , Underwood J Two design pattems for facilitating Building Information Modelbased synchronous collaboration[J]. Automation in Construction, 2010,19(5):544-553.
[13]Abanda F H ,Tah J H M ,Cheung F K T BIM in o ffsite manufacturing for buildings[J]Journal ofBuilding Engineering,2017,14:89-102.
[14]Yashiro T. Conceptual framework of the evolution and transformation of the idea of the industrialization of buil ding in Japan[J]. Construction Management and Economics,2014,32(1-2):16-39.