装配式建筑中BIM技术在IPD模式下的协调应用研究
摘要
关键词
全文:
PDF参考
[1] Kim,Y.W,DOSSICK C.S.What Makes the Delivery ofa Project Integrated Acase study of Children's Hospital,Bellevue,WA [J] Lean Construction Journal,2011,1:53-56.
[2] Ghassemi R,Becerik-Gerber B.Transitioning to Integrated Project Delivery: Potential barriers and lessons learned[J].Lean construction journal,2011:32-52.
[3] Sacks R,Koskela L,Dave B A,et al Interaction of Lean and Building Information Modeling in Construction[J]. Journal of Construction Engineering and Management,2010, 136:968-980.
[4]陈燕.基于BIM的IPD协同工作模型在装配式建筑中的应用【J】.长春工程学院学报(自然科学版),2019,20(01):5-8.
[5]何清华,王剑峰. BIM技术与精益建造技术在IPD模式中的应用研究【J】.工程管理学报,2018.04.
[6]王禹杰,侯亚玮 BIM在建设项目IPD管理模式中的应用研究【J】.建筑经济,2015,36(09):52-55.
[7]Fish, Aman.Integrated project delivery the obstacles of implementation[OL].[2011.08.08].
[8]Vishal, Singh, and, et al. A theoretical framework of a BIM-based multi-disciplinary collaboration platform[J]. Automation in Construction,2011.
[9]Isikdag U , Underwood J Two design pattems for facilitating Building Information Modelbased synchronous collaboration[J]. Automation in Construction, 2010,19(5):544-553.
[10]燕韦韦,BIM技术在工程项目协调管理中的应用探索【J】.工程管理,2020.02.
[11]李宾皑,焦丽琴,杨宇. BIM技术在工程项目协调管理中的应用【J】.智能城市.2019.10.16.
[12]姚刚.基于BIM的工业化住宅协调设计的关键要素与整合应用研究【D】.东南大学,2016.
[13]Abanda F H ,Tah J H M ,Cheung F K T BIM in o ffsite manufacturing for buildings[J]Journal ofBuilding Engineering,2017,14:89-102.
[14]Yashiro T. Conceptual framework of the evolution and transformation of the idea of the industrialization of buil ding in Japan[J]. Construction Management and Economics,2014,32(1-2):16-39.
[15]杨帆.基于BIM与物联网的装配式建筑设计与施工管理【D】西安科技大学,2019.
[16]金喜月,杨晓林.新型建筑工业化与BIM技术的协同关系研究【J】工程管理学报,2018,32(03):35-40.
DOI: http://dx.doi.org/10.12361/2661-3565-05-16-150572
Refbacks
- 当前没有refback。